Normally, a run of pipe is laid at five feet then looped back over itself at three feet once the bottom pipe is covered with soil. This allows more length of pipe to be put in one trench and has no adverse affect on system efficiency. Other loop designs use four or six pipes and allow for shorter trenches if land area is limited.